The Railway Procurement Agency (RPA), on 24th June 2010, applied to An Bord Pleanála for a Railway Order for Luas Broombridge (St. Stephen’s Green to Broombridge). This order, if granted, would permit RPA to construct, operate and maintain a light railway line between St. Stephen’s Green and Broombridge.


This unique website was created for the Luas Broombridge Railway Order application.


Structure of the Railway Order Application Documents

The Railway Order Application for Luas Broombridge is accompanied by the following documents:
Draft Railway Order
Return to Top

Environmental Impact Statement and Environmental Impact Statement Non - Technical Summary

This Environmental Impact Statement (EIS) has been prepared to accompany the Railway Order application for Luas Broombridge (Line BXD St. Stephen’s Green to Broombridge). For the purposes of this EIS and ease of local identification and interest, the proposed scheme has been divided into two areas: Area 29 and Area 30. The EIS is published as five separate books (Book 1 – 5) and a Non-Technical Summary (NTS) as follows:

Book 1 Introduction and Baseline Environment

Book 1
Book 1 (A3 Version Chapter 7A Architecture Design Strategy)
Return to Top

Books 2 and 3 Impact Assessment

Books 2 and 3 contain the impact assessments with respect to all environmental topics (Chapters 1-18). Book 2 contains the impact assessment for Area 29. Book 3 contains the impact assessment for Area 30.

Book 2
Book 3
Return to Top

Book 4 Maps

Book 4 contains all baseline and impact assessment maps of this EIS relating to the chapters in Books 1-3.

Book 4 Maps
Return to Top

Book 5 Annexes

Book 5 contains all baseline and impact assessment annexes of this EIS. These provide additional and supporting information to the chapters in Books 1-3.

Book 5 Annexes
Return to Top

Non-Technical Summary (NTS)

The NTS has been prepared as part of the Luas Broombridge Railway Order application. Written in non-technical language, it presents the key findings in respect of the construction and operation of the Luas Broombridge scheme. The detail in relation to all topics outlined in this book is presented in the main EIS, Books 1-5 inclusive.

Return to Top

Plan of Proposed Railway Works

The plan of the railway works referred to in the Draft Railway Order is made up of 3 sets of drawings; Alignment and Property Details, Structure Details and Utilities.

Alignment and Property Details:

Structure Details:

Return to Top

Utilities:

Return to Top


Luas Broombridge Application for Railway Order Newspaper Notice
Return to Top

Inspection of the Draft Railway Order and Accompanying Documents

A copy of the Draft Railway Order and each document accompanying the application may be inspected during normal office or opening hours from the 30th of June 2010 for the duration of 6 weeks until the 13th of August 2010, as set out by the Newspaper Notice, at: A copy of the Draft Railway Order and documents accompanying the application can also be downloaded from this web-page. Simply click on any of the links and follow the instructions.

Return to Top

Purchase of Documents

A copy of the Draft Railway Order and documents accompanying the application can be downloaded free of charge from this web-page. Simply click on any of the links above and follow the instructions.

Copies or extracts from the documents, including the Environmental Impact Statement and the Non-Technical Summary, may be purchased on payment of a fee not exceeding the reasonable cost of making such copy or extract from:
Environmental Impact Statement (All Books including NTS)€145.00
Environmental Impact Statement Non-Technical Summary €5.00
Environmental Impact Statement (Book 1)€50.00
Environmental Impact Statement (Book 2)€20.00
Environmental Impact Statement (Book 3)€20.00
Environmental Impact Statement (Book 4)€30.00
Environmental Impact Statement (Book 5)€20.00


A DVD version of the whole EIS maybe purchased for €15 which includes Books 1-5 and the Non Technical Summary.


Written Submissions

An Bord Pleanála will consider any submissions in relation to the proposed Railway Order or in relation to the likely effects on the environment of the proposed railway works which are submitted in writing to it by any person and accompanied by a fee of €50. (This fee is not payable by certain bodies with environmental responsibilities or by persons whose lands may be acquired under the order). Submissions must be lodged not later than the 13th day of August 2010 at 5:30pm and must be addressed to An Bord Pleanála, 64 Marlborough Street, Dublin 1 and marked Luas Broombridge.


Oral Hearing

An Bord Pleanála may at its absolute discretion hold an oral hearing into the application for a Railway Order.